| Year | 2019 |
|---|---|
| Authors | Teng-Sheng Su |
| Author Type | First Author,Corresponding Author |
| Vol.No | 38 |
| Issue.No | C |
| Page(s) | 1130-1137 |
| Language | English |
Login 高雄科技大學企業管理系
| Year | 2019 |
|---|---|
| Authors | Teng-Sheng Su |
| Author Type | First Author,Corresponding Author |
| Vol.No | 38 |
| Issue.No | C |
| Page(s) | 1130-1137 |
| Language | English |